News Published: Mar 15, 2019 - 6:28:29 AM


Ridgefield Thrift Shop helps get the Ridgefield Ramble ready for construction

By Norwalk River Valley Trail


Font size: Small Big
Email this article
 Printer friendly page
Share this article:
facebook del.icio.us Yahoo! MyWeb Digg reddit Furl Blinklist Spurl
Buy the "As seen on" mug
nrvt.jpg
Charlie Taney, NRVT’s Executive Director, receiving grant check from Debbie Murphy, Ridgefield Thrift Shop Finance Committee Chairperson along the planned route of the Ridgefield Ramble. (contributed photo)
The Ridgefield Thrift Shop has granted $8,000 to the Norwalk River Valley Trail (NRVT) to help fund the costs of surveying, engineering and permitting for the Ridgefield Ramble, the NRVT’s first section in town.

A planning team of Ridgefield residents has selected a 1.5 mile section running north from the intersection of Rt. 7 & Simpaug Turnpike to Bobby’s Court on the Redding line. It’s been dubbed the Ridgefield Ramble. It will be a ten-foot wide, multi-use trail winding through conservation land along the Norwalk River. When completed, the Ramble will be readily available to a wide range of trail users; hikers, bikers, moms with baby strollers, dog walkers and young children learning to ride their bikes. The NVRT will, wherever possible, be constructed to be accessible to people with mobility disabilities.

Timber & Stone, NRVT’s trail builder, has designed and flagged the 1.5 mile route. Prior to construction, there are wetlands flagging, surveying and engineering costs required for the construction permits from the Town of Ridgefield and the State Department of Transportation. The $8,000 grant from the Ridgefield Thrift Shop will enable the NRVT to get started with these pre-construction projects.
The NRVT anticipates completing permitting process within the next year. Construction of the Ridgefield Ramble will depend on private, corporate and foundation grants. The NRVT hopes to start construction of the Ramble in 2020.
The NRVT’s vision is a 30-mile, ten-foot wide, multi-use trail running from Calf Pasture Beach in Norwalk, through Wilton, Ridgefield and Redding and terminating at Tarrywile Park in Danbury.




© Copyright by ShorelinePlus.com. Some articles and pictures posted on our website, as indicated by their bylines, were submitted as press releases and do not necessarily reflect the position and opinion of ShorelinePlus.com, Canaiden LLC or any of its associated entities. Articles may have been edited for brevity and grammar. Photos without a credit line are "contributed photos".





CURRENT HEADLINES:
American Family Care Hosts Grand Opening VIP Reception in Torrington
Lamont applauds momentum for supporting working families as paid family and medical leave bill is approved in committee
Stamford Symphony Announces Dr. Janey Choi, as the First Director of Community Engagement and Education
Dos and Don'ts for parents when searching for a summer camp
Sixth Annual Norwalk LitCrawl to Benefit Norwalk Reads

Top of Page






ShorelinePlus.com is part of the Canaiden Online Media Network!

Stamford Plus Online | Norwalk Plus Online | ShorelinePlus.com | ConnecticutPlus.com | Canaiden.com
Best of Norwalk | Best of Stamford | Hauterfly Magazine | SummerCampPlus.com | WeatherinCT.com

Copyright ©2005-2010 Canaiden, LLC All Rights Reserved.